Mount Maunganui
All Maintenance Updates by Fulton Hogan in the Mount Maunganui Area
What’s happening in the Mount?
Tauranga City Council has contracted Fulton Hogan Ltd to carry out repairs and maintenance in Mount Maunganui.
This work is part of the Council’s annual programme, improving road safety and investing in our roading assets, including footpaths.
Our work is very weather dependant so dates may change due to the weather or other unforeseen circumstances.
Our roadworks include heavy machinery which unfortunately can create noise, vibration and types of environmental factors (including cement dust for example).
MIRO STREET Parking Improvements Project ~ STAGE ONE
Status: COMPLETED
Stage 1: ISLAND REMOVAL AND SURFACING REJUVENATION TREATMENT
Date of Works: MONDAY 23RD TO FRIDAY 27TH MARCH 2026
Type of Works: Island Removal and Surfacing Rejuvenation Treatment
Island Removal. The existing traffic islands at the intersection of Miro Street and Matai Street need to be removed as part of the road layout change. Once the islands are removed an asphalt surface will be placed.
Surfacing Rejuvenation Work. This involves the application of an Emulsion & Polymer based surfacing product called Jet-black® on the existing road surface. This product does not require any chip application.
During all works, there will be movement of construction equipment and workers in and around the site. We will endeavour to minimise the noise and dust emitted as part of our works and apologise in advance for this temporary nuisance.
Additional Information:
The affected area highlighted will be operating under a one-way lane closure and stop/go. There will be up to 4 hours where you may not be able to access your property with a vehicle.
The Traffic Management team will be onsite to assist when able.
MIRO STREET Parking Improvements Project ~ STAGE TWO
Status: ACTIVE
Stage 2: CONCRETE FOOTPATH CONSTRUCTION
Date of Works: MONDAY 30TH MARCH TO FRIDAY 24TH APRIL 2026
Type of Works: Concrete Footpath Construction
The new footpath will be constructed in four sections with one section completed per week. An indication of the sequencing is detailed below. Please note that lengths of the sections may differ slightly based on site conditions and weather.
Additional Information:
The area shown will be managed with a lane diversion and stop/go traffic controls. Please follow the signs and the directions of our traffic team as you move through the site. Your patience helps keep everyone safe, and we truly appreciate it.
Access to and from properties will mostly remain unchanged. In most cases, the new footpath will connect smoothly with existing entranceways. The two cobbled entranceways at numbers 27 and 29 will need some partial reconstruction, which means access will be limited while the concrete sets. Our team will speak directly with the residents at these properties to make sure access needs are understood and managed.
The new road layout allows the work to proceed with minimal impact on traffic management. However, there will be times when parking is not permitted directly outside the active work area. Please follow all posted no‑parking signs and ensure vehicles are always kept clear of these zones. We also ask that all vehicles remain off the grass berm, as the team will be using this area for construction equipment and trucks.
MATAI STREET, MIRO STREET, PURIRI STREET AND TAWA STREET Chipsealing
Status: ACTIVE
Date of Works: TAWA STREET & MIRO STREET TUESDAY 31ST MARCH 2026
Date of Works: PURIRI STREET & MATAI STREET WEDNESDAY 1ST APRIL 2026
Type of Works: Chipsealing
We resurface our roads to prevent water damaging the layers underneath and potholes forming. Maintaining our roads means we can all move around our city easily and safely.
Loose chip will be swept within a few days of sealing with a second sweep approximately one month later.
Over the next few months, the chipseal will continue to settle, with vehicle traffic playing a key role in the process. Please be assured that we will continue to monitor the road and when necessary, return to sweep up excess loose chip.
Please maintain the temporary speed limit while it is in place. Driving too fast will flick up loose stone chips.
Additional Information:
The highlighted areas will be closed one at a time to minimise disruption, however there will likely be additional traffic management present in the surrounding area. You will continue to have access to and from your property while the sealing operation is in progress.
Please allow a little extra time and speak with the on‑site Traffic Management team, who will guide you safely through the site. Please note that if the works are directly in your path, there may be a brief delay.
OCEANVIEW ROAD Bollard Installation
Status: ACTIVE
Date of Works: TUESDAY 31ST MARCH 2026
Type of Works: Bollard Installation
Fulton Hogan Ltd will be installing two bollards on Oceanview Road.
There will be minimal disruption to residents and businesses.
Additional Information:
The affected area is highlighted.
CAMPBELL ROAD Footpath Repair
Status: ACTIVE
Date of Works: MONDAY 30TH MARCH TO WEDNESDAY 1ST APRIL 2026
Type of Works: FOOTPATH REPAIRS
Pedestrians will be shown the safest path to follow at all times. We will endeavour to keep noise to a minimum where possible.
Additional Information:
The affected area is highlighted. This site will be operating under footpath closure and shoulder closure. Residents will still be able to access their properties.
Please speak to the Traffic Management team on site to be guided safely through the worksite and we ask you allow additional time for this.
During the curing process, it’s essential that no traffic passes over the freshly poured concrete.
The footpath will open again on Tuesday 7th April 2026.
RANCH ROAD Footpath Repair
Status: ACTIVE
Date of Works: TUESDAY 7TH TO FRIDAY 10TH APRIL 2026
Type of Works: FOOTPATH REPAIRS
Pedestrians will be shown the safest path to follow at all times. We will endeavour to keep noise to a minimum where possible.
Additional Information:
The affected area is highlighted. This site will be operating under footpath closure and shoulder closure.
Please speak to the Traffic Management team on site to be guided safely through the worksite and we ask you allow additional time for this.
During the curing process, it’s essential that no traffic passes over the freshly poured concrete.
The footpath will open again on Tuesday 7th April 2026.
ASCOT ROAD Footpath Repair
Status: ACTIVE
Date of Works: TUESDAY 31ST MARCH TO THURSDAY 2ND APRIL 2026
Type of Works: FOOTPATH REPAIRS
Pedestrians will be shown the safest path to follow at all times. We will endeavour to keep noise to a minimum where possible.
Additional Information:
The affected area is highlighted. This site will be operating under footpath closure and should closure. Residents will still be able to access their properties.
Please speak to the Traffic Management team on site to be guided safely through the worksite and we ask you allow additional time for this.
During the curing process, it’s essential that no traffic passes over the freshly poured concrete.
The footpath will open again on Tuesday 7th April 2026.
CONCORD AVENUE Footpath Repair
Status: ACTIVE
Date of Works: TUESDAY 31ST MARCH TO THURSDAY 2ND APRIL 2026
Type of Works: FOOTPATH REPAIRS
Pedestrians will be shown the safest path to follow at all times. We will endeavour to keep noise to a minimum where possible.
Additional Information:
The affected area is highlighted. This site will be operating under footpath closure and should closure. Residents will still be able to access their properties.
Please speak to the Traffic Management team on site to be guided safely through the worksite and we ask you allow additional time for this.
During the curing process, it’s essential that no traffic passes over the freshly poured concrete.
The footpath will open again on Tuesday 7th April 2026.
FIFE LANE Maintenance Repairs
Status: DELAYED
Date of Works: WEDNESDAY 1ST AND THURSDAY 2ND APRIL 2026
Type of Works: Maintenance Repairs
Works include repairing the damaged kerb and channel and cutting out the damaged section of asphalt and filling it in.
Additional Information:
The affected area is highlighted. The site will be operating under a priority give way. Businesses will still have access to their properties.
Please speak to the Traffic Management team on site to be guided safely through the worksite and we ask you allow additional time for this.
MAUNGANUI ROAD Footpath Repair
Status: COMPLETED
Date of Works: MONDAY 2ND MARCH TO WEDNESDAY 4TH MARCH 2026
Type of Works: FOOTPATH REPAIRS
Pedestrians will be shown the safest path to follow at all times. We will endeavour to keep noise to a minimum where possible.
Additional Information:
The affected area is highlighted and will be closed. Residents and businesses will still be able to access their properties.
During the curing process, it’s essential that no traffic passes over the freshly poured concrete.
The footpath will open again on Monday 9th March 2026.
MAUNGANUI ROAD Footpath Repair
Status: COMPLETED
Date of Works: MONDAY 2ND MARCH TO WEDNESDAY 4TH MARCH 2026
Type of Works: FOOTPATH REPAIRS
Pedestrians will be shown the safest path to follow at all times. We will endeavour to keep noise to a minimum where possible.
Additional Information:
The affected area is highlighted and will be closed. This includes the carparks directly in front of the work area.
During the curing process, it’s essential that no traffic passes over the freshly poured concrete.
The footpath will open again on Friday 6th March 2026 in the afternoon.
TE NGAIO ROAD Chipsealing
Status: COMPLETED
Date of Works: WEDNESDAY 4TH MARCH 2026
Type of Works: Chipsealing
We resurface our roads to prevent water damaging the layers underneath and potholes forming. Maintaining our roads means we can all move around our city easily and safely.
Loose chip will be swept within a few days of sealing with a second sweep approximately one month later.
Over the next few months, the chipseal will continue to settle, with vehicle traffic playing a key role in the process. Please be assured that we will continue to monitor the road and when necessary, return to sweep up excess loose chip.
Please maintain the temporary speed limit while it is in place. Driving too fast will flick up loose stone chips.
Additional Information:
The affected area is highlighted and will be closed. You will continue to have access to and from your property while the sealing operation is in progress.
Please allow a little extra time and speak with the on‑site Traffic Management team, who will guide you safely through the site. Please note that if the works are directly in your path, there may be a brief delay.
MURICATA AVENUE Chipsealing
Status: COMPLETED
Date of Works: THURSDAY 5TH MARCH 2026
Type of Works: Chipsealing
We resurface our roads to prevent water damaging the layers underneath and potholes forming. Maintaining our roads means we can all move around our city easily and safely.
Loose chip will be swept within a few days of sealing with a second sweep approximately one month later.
Over the next few months, the chipseal will continue to settle, with vehicle traffic playing a key role in the process. Please be assured that we will continue to monitor the road and when necessary, return to sweep up excess loose chip.
Please maintain the temporary speed limit while it is in place. Driving too fast will flick up loose stone chips.
Additional Information:
The affected area is highlighted and will be closed, however there will likely be additional traffic management present in the surrounding area. You will continue to have access to and from your property while the sealing operation is in progress.
Please allow a little extra time and speak with the on‑site Traffic Management team, who will guide you safely through the site. Please note that if the works are directly in your path, there may be a brief delay.
OCEANBEACH ROAD AND YALE STREET Chipsealing
Status: COMPLETED
Date of Works: MONDAY 2ND MARCH 2026
Type of Works: Chipsealing
We resurface our roads to prevent water damaging the layers underneath and potholes forming. Maintaining our roads means we can all move around our city easily and safely.
Loose chip will be swept within a few days of sealing with a second sweep approximately one month later.
Over the next few months, the chipseal will continue to settle, with vehicle traffic playing a key role in the process. Please be assured that we will continue to monitor the road and when necessary, return to sweep up excess loose chip.
Please maintain the temporary speed limit while it is in place. Driving too fast will flick up loose stone chips.
Additional Information:
The highlighted areas will be closed one at a time to minimise disruption, however there will likely be additional traffic management present in the surrounding area. You will continue to have access to and from your property while the sealing operation is in progress.
Please allow a little extra time and speak with the on‑site Traffic Management team, who will guide you safely through the site. Please note that if the works are directly in your path, there may be a brief delay.
MATAPIHI ROAD Second Coat Sealing
Status: COMPLETED
Date of Works: TUESDAY 3RD MARCH 2026
Type of Works: Second Coat Sealing
This is the second and final chipseal over the road repair we did earlier.
Loose chip will be swept within a few days of sealing with a second sweep approximately one month later.
Over the next few months, the chipseal will continue to settle, with vehicle traffic playing a key role in the process. Please be assured that we will continue to monitor the road and when necessary, return to sweep up excess loose chip.
Please maintain the temporary speed limit while it is in place. Driving too fast will flick up loose stone chips.
Additional Information:
The affected area is highlighted and will be operating under stop/go traffic management. Please be aware that access to your property may be delayed while sealing operations are in progress.
Please speak to the Traffic Management team on site to be guided safely through the worksite and we ask you allow additional time for this.
RITA STREET Chipsealing
Status: COMPLETED
Date of Works: THURSDAY 26TH FEBRUARY 2026
Type of Works: Chipsealing
We resurface our roads to prevent water damaging the layers underneath and potholes forming. Maintaining our roads means we can all move around our city easily and safely.
Loose chip will be swept within a few days of sealing with a second sweep approximately one month later.
Over the next few months, the chipseal will continue to settle, with vehicle traffic playing a key role in the process. Please be assured that we will continue to monitor the road and when necessary, return to sweep up excess loose chip.
Please maintain the temporary speed limit while it is in place. Driving too fast will flick up loose stone chips.
Additional Information:
The affected area is highlighted and will be closed. Access to your property may be delayed while sealing operations are in progress.
Please speak to the Traffic Management team on site to be guided safely through the worksite and we ask you allow additional time for this.
DENNY HULME DRIVE Chipsealing
Status: COMPLETED
Date of Works: MONDAY 23RD FEBRUARY 2026
Type of Works: Chipsealing
We resurface our roads to prevent water damaging the layers underneath and potholes forming. Maintaining our roads means we can all move around our city easily and safely.
Loose chip will be swept within a few days of sealing with a second sweep approximately one month later.
Over the next few months, the chipseal will continue to settle, with vehicle traffic playing a key role in the process. Please be assured that we will continue to monitor the road and when necessary, return to sweep up excess loose chip.
Please maintain the temporary speed limit while it is in place. Driving too fast will flick up loose stone chips.
Additional Information:
The highlighted areas will be closed one at a time to minimise disruption, however there will likely be additional traffic management present in the surrounding area. Access to your property may be delayed while sealing operations are in progress.
Please speak to the Traffic Management team on site to be guided safely through the worksite and we ask you allow additional time for this.
EVERSHAM ROAD AND KINGSLEY PLACE Fibredec Chipsealing
Status: COMPLETED
Date of Works: MONDAY 16TH AND TUESDAY 17TH FEBRUARY 2026
Type of Works: Fibredec Chipsealing
We resurface our roads to prevent water damaging the layers underneath and potholes forming. Maintaining our roads means we can all move around our city easily and safely.
The binder in FibreDec contains fibre to help bridge cracks in the road, giving the coating greater flexibility, strength and waterproofing properties compared to traditional chipseal. This binder is then covered with chip to complete the new waterproof protective surfacing on your street.
Over the next few months, the chipseal will continue to settle, with vehicle traffic playing a key role in the process. Please be assured that we will continue to monitor the road and when necessary, return to sweep up excess loose chip.
Please maintain the temporary speed limit while it is in place. Driving too fast will flick up loose stone chips.
Additional Information:
The affected area will be closed. Access to your property may be delayed while sealing operations are in progress.
Please speak to the Traffic Management team on site to be guided safely through the worksite and we ask you allow additional time for this.