Sweeping

All Maintenance Sweeping Updates by Fulton Hogan in the Tauranga City Area

What’s happening in Tauranga?

Tauranga City Council has contracted Fulton Hogan Ltd to carry out repairs and maintenance in Tauranga City.

This work is part of the Council’s annual programme, improving road safety and investing in our roading assets, including footpaths.

Our work is very weather dependant so dates may change due to the weather or other unforeseen circumstances.

Our roadworks include heavy machinery which unfortunately can create noise, vibration and types of environmental factors (including cement dust for example).

PARAONE KOIKOI DRIVE Asphalt Resurfacing

Status: MANHOLE REPAIR

Date of Works: TUESDAY 12TH MAY 2026

Type of Works: Asphalt Resurfacing

Fulton Hogan Ltd, contracted by Tauranga City Council, is resurfacing the road in your area as part of Council’s annual maintenance programme. We resurface our roads to prevent water damaging the layers underneath and potholes forming. Maintaining our roads means we can all move around our city easily and safely.

As part of the staging for these works, you may experience a temporary road surface with level changes. Please drive carefully through the site.   

Additional Information:

The affected area is highlighted will be closed. You will continue to have access to and from your property while the asphalt operation is in progress.

Please allow a little extra time and speak with the on-site Traffic Management team, who will guide you safely through the site. Please note that if the works are directly in your path, there may be a brief delay.

OHAUITI ROAD Asphalt Resurfacing

Status: ACTIVE - UPDATED

Date of Works: TUESDAY 5TH TO THURSDAY 7TH AND SUNDAY 10TH TO MONDAY 11TH MAY 2026 - NIGHT WORKS

Type of Works: Asphalt Resurfacing

Fulton Hogan Ltd, contracted by Tauranga City Council, is resurfacing the road in your area as part of Council’s annual maintenance programme. We resurface our roads to prevent water damaging the layers underneath and potholes forming. Maintaining our roads means we can all move around our city easily and safely.

As part of the staging for these works, you may experience a temporary road surface with level changes. Please drive carefully through the site.   

Additional Information:

Stage one:The blue highlighted area will be closed. The greenhighlighted area will be operating under stop/go traffic management. This is planned for Tuesday 5th & Wednesday 6th May 2026.

Stage two:The green highlighted area will be closed. The blue highlighted area will be operating under stop/go traffic management. This is planned for Thursday 7th May 2026.

Stage three:The orange highlighted area will be closed. This is planned for Sunday 10th & Monday 11th May 2026.

ATHFIELD DRIVE, HAWKRIDGE HEIGHTS, AND WESTMORLAND RISE ROUNDABOUT Asphalt Resurfacing and Mill and Fill Patches

Status: ACTIVE

Date of Works: SUNDAY 10TH TO TUESDAY 12TH MAY 2026 - NIGHT WORKS

Type of Works: Asphalt Resurfacing

Fulton Hogan Ltd, contracted by Tauranga City Council, is resurfacing the road in your area as part of Council’s annual maintenance programme. We resurface our roads to prevent water damaging the layers underneath and potholes forming. Maintaining our roads means we can all move around our city easily and safely.

As part of the staging for these works, you may experience a temporary road surface with level changes. Please drive carefully through the site.   

Additional Information:

The affected area is highlighted and will be closed. A section of Carmichael Road will be operating under stop/go traffic management to allow for plant movement and plant parking through the site.  You will continue to have access to and from your property while the asphalt operation is in progress.

Please allow a little extra time and speak with the on‑site Traffic Management team, who will guide you safely through the site. Please note that if the works are directly in your path, there may be a brief delay

MAYFAIR STREET Asphalt Resurfacing

Status: ACTIVE - UPDATED

Date of Works: WEDNESDAY 13TH MAY 2026 - NIGHT WORKS

Type of Works: Asphalt Resurfacing

Fulton Hogan Ltd, contracted by Tauranga City Council, is resurfacing the road in your area as part of Council’s annual maintenance programme. We resurface our roads to prevent water damaging the layers underneath and potholes forming. Maintaining our roads means we can all move around our city easily and safely.

As part of the staging for these works, you may experience a temporary road surface with level changes. Please drive carefully through the site.   

Additional Information:

The affected area is highlighted and will be closed. There will be a lane diversion in place on Fifteenth Avenue. You will continue to have access to and from your property while the asphalt operation is in progress.

Please allow a little extra time and speak with the on‑site Traffic Management team, who will guide you safely through the site. Please note that if the works are directly in your path, there may be a brief delay.

HYNDS ROAD Footpath Repairs

Status: ACTIVE

Date of Works: TUESDAY 5TH TO FRIDAY 8TH MAY 2026

Type of Works: Footpath Repairs

Fulton Hogan will be undertaking footpath repairs in your neighbourhood.

Additional Information:

The affected areas are highlighted and will be operating under footpath closures and shoulder closures.

Residents will still be able to access their properties. Please speak to the Traffic Management team on site to be guided safely through the worksite and we ask you allow additional time for this.

 During the curing process, it’s essential that no traffic passes over the freshly poured concrete. The footpaths will open again on Monday 11th May 2026.

TOM MUIR DRIVE Footpath Repairs

Status: ACTIVE

Date of Works: MONDAY 4TH TO FRIDAY 8TH MAY 2026

Type of Works: Footpath Repairs

Fulton Hogan will be undertaking footpath repairs in your neighbourhood.

Additional Information:

The affected areas are highlighted and will be operating under footpath closures and shoulder closures.

Residents will still be able to access their properties. Please speak to the Traffic Management team on site to be guided safely through the worksite and we ask you allow additional time for this.

 During the curing process, it’s essential that no traffic passes over the freshly poured concrete. The footpaths will open again on Monday 11th May 2026.

OTEKI PARK Footpath Repairs

Status: COMPLETED

Date of Works: MONDAY 13TH TO FRIDAY 1ST MAY 2026

Type of Works: Footpath Repairs

Fulton Hogan will be undertaking footpath repairs in your neighbourhood.

Additional Information:

The affected areas are highlighted.  These site will be operating under footpath closure and shoulder closure.  Residents will still be able to access their properties.

Please speak to the Traffic Management team on site to be guided safely through the worksite and we ask you allow additional time for this.

During the curing process, it’s essential that no traffic passes over the freshly poured concrete. The footpaths will open again on

HASTINGS ROAD, LAKES BOULEVARD, AND LANDING DRIVE ROUNDABOUT Asphalt Resurfacing

Status: COMPLETED

Date of Works: THURSDAY 30TH APRIL AND SUNDAY 3RD MAY 2026 - NIGHT WORKS

Type of Works: Asphalt Resurfacing

Fulton Hogan Ltd, contracted by Tauranga City Council, is resurfacing the road in your area as part of Council’s annual maintenance programme. We resurface our roads to prevent water damaging the layers underneath and potholes forming. Maintaining our roads means we can all move around our city easily and safely.

As part of the staging for these works, you may experience a temporary road surface with level changes. Please drive carefully through the site.   

Additional Information:

The affected area is highlighted, and will be operating under a road closure, and stop/go traffic management. You will continue to have access to and from your property while the asphalt operation is in progress.

Please allow a little extra time and speak with the on‑site Traffic Management team, who will guide you safely through the site. Please note that if the works are directly in your path, there may be a brief delay.

CLARKE STREET Asphalt Resurfacing

Status: COMPLETED

Date of Works: MONDAY 27TH APRIL 2026 - NIGHT WORKS

Type of Works: Asphalt Resurfacing

Fulton Hogan Ltd, contracted by Tauranga City Council, is resurfacing the road in your area as part of Council’s annual maintenance programme. We resurface our roads to prevent water damaging the layers underneath and potholes forming. Maintaining our roads means we can all move around our city easily and safely.

As part of the staging for these works, you may experience a temporary road surface with level changes. Please drive carefully through the site.   

Additional Information:

The affected area is highlighted and will be closed. Access will be maintained at all times for St John and the Hospital. You will continue to have access to and from your property while the sealing operation is in progress.

Please allow a little extra time and speak with the on‑site Traffic Management team, who will guide you safely through the site. Please note that if the works are directly in your path, there may be a brief delay.

OROPI ROAD Emergency Works

Status: COMPLETED

Date of Works: THURSDAY 30TH APRIL TO FRIDAY 1ST MAY 2026

Type of Works: Emergency Works

On Monday, 20th April an under-slip occurred on Ōropi Road north of the SH29A roundabout, affecting the road shoulder. Site testing is needed before any repairs are carried out.
Ōropi Road between Maleme Street and SH29A will be closed from 6am Thursday, 30th April to 6pm Friday, 1st May 2026 to carry out this emergency work.  If the work is completed earlier than expected, the road closure will be lifted earlier. The road will be open in time for the weekend

The works to remediate the slip will happen at a later date. Further details will be shared once they are available. 

Additional Information:

The affected area is highlighted below and will be closed for the duration of the investigation work.

All traffic from SH29A will be detoured to Cameron Road and along Maleme St and vice versa for Oropi Road traffic. There will also be no right turn available from Maleme St onto Oropi road.

HARRISFIELD DRIVE Footpath Repairs

Status: COMPLETED

Date of Works: TUESDAY 21ST TO FRIDAY 24TH APRIL 2026

Type of Works: Footpath Repairs

Fulton Hogan will be undertaking footpath repairs in your neighbourhood.

Additional Information:

The affected area is highlighted.  This site will be operating under footpath closure and shoulder closure.  Residents will still be able to access their properties.

Please speak to the Traffic Management team on site to be guided safely through the worksite and we ask you allow additional time for this.

During the curing process, it’s essential that no traffic passes over the freshly poured concrete. The footpaths will open again on Friday 24th April 2026.

CUMBERLAND CRESCENT Footpath Repairs

Status: COMPLETED

Date of Works: FRIDAY 24TH APRIL 2026

Type of Works: Footpath Repairs

Fulton Hogan will be undertaking footpath repairs in your neighbourhood.

Additional Information:

The affected area is highlighted.  This site will be operating under footpath closure and shoulder closure.  Residents will still be able to access their properties.

Please speak to the Traffic Management team on site to be guided safely through the worksite and we ask you allow additional time for this.

During the curing process, it’s essential that no traffic passes over the freshly poured concrete. The footpaths will open again on Friday 24th April 2026.

OSPREY DRIVE Footpath Repairs

Status: COMPLETED

Date of Works: TUESDAY 7TH TO FRIDAY 17TH APRIL 2026

Type of Works: Footpath Repairs

Fulton Hogan will be undertaking footpath repairs in your neighbourhood.

Additional Information:

The affected area is highlighted.  This site will be operating under footpath closure and shoulder closure.  Residents will still be able to access their properties.

Please speak to the Traffic Management team on site to be guided safely through the worksite and we ask you allow additional time for this.

PORTLAND STREET Footpath Repairs

Status: COMPLETED

Date of Works: TUESDAY 7TH TO THURSDAY 16TH APRIL 2026

Type of Works: Footpath Repairs

Fulton Hogan will be undertaking footpath repairs in your neighbourhood.

Additional Information:

The affected area is highlighted.  This site will be operating under footpath closure and shoulder closure.  Residents will still be able to access their properties.

Please speak to the Traffic Management team on site to be guided safely through the worksite and we ask you allow additional time for this.

EMMETT STREET, GREERTON ROAD AND POOLES ROAD Chipsealing

Status: COMPLETED

Date of Works: THURSDAY 16TH TO FRIDAY 17TH APRIL 2026

Type of Works: Chipsealing

We resurface our roads to prevent water damaging the layers underneath and potholes forming. Maintaining our roads means we can all move around our city easily and safely.

Loose chip will be swept within a few days of sealing with a second sweep approximately one month later. 

Over the next few months, the chipseal will continue to settle, with vehicle traffic playing a key role in the process. Please be assured that we will continue to monitor the road and when necessary, return to sweep up excess loose chip.

Please maintain the temporary speed limit while it is in place. Driving too fast will flick up loose stone chips.

Additional Information:

The highlighted areas will be closed one at a time to minimise disruption, however there will likely be additional traffic management present in the surrounding area. Access to your property may be delayed while sealing operations are in progress.

Please speak to the Traffic Management team on site to be guided safely through the worksite and we ask you allow additional time for this.

Read More